Challenge

Sanitary Standard works the way an engineering firm works rather than the way a cleaning contractor usually does. Every site gets a specification written for it, built from the client’s requirements, the manufacturer’s care guidance for each floor and surface finish, and the details that standard protocols leave out. Delivery runs on industrial equipment with HEPA filtration and agents chosen for surface compatibility, and the company audits its own work against the specification to stop standards drifting once a contract settles into routine. The methodology is the product. The difficulty is that it lives in documents, in supervisors’ judgement and in habit, which means every new site is re-derived by hand and every audit depends on someone remembering to run it.

Digitising that is not a software problem at the outset. It is the problem of working out which parts of a method are rules, which are judgement and which are simply how things have always been done, and only the first of those three can be automated. So the two requests were for a Business Analyst and a Project Manager, neither of them an engineer. The analyst brought two decades of mapping how organisations operate and turning that into specifications precise enough to build from: process mapping, requirements traceability, and backlogs structured into epics and user stories rather than wish lists. The project manager brought twenty years of delivery governance across multi-tier systems, and of adapting Agile, Scrum or Kanban to the organisation in front of them rather than importing a framework wholesale.

The screening followed from that. What mattered was process work done inside operational businesses rather than inside software companies, because the people with the answers here are site supervisors and cleaners rather than product stakeholders in a meeting room, and an analyst who has only worked in tech will struggle to get a straight answer. Both roles were also screened as a pair, and both engagements were confirmed 38 hours after the request opened.

2
Talents Secured
2+
Months
38h
Time-to-hire

Outcome

A business can only automate what it can describe. Sanitary Standard already had the rarer half of that, which is a methodology precise enough to audit against, and what it lacked was the translation of that methodology into something a system could run. Two people, two months, and no engineering commissioned until the operation had been written down properly.

  • Two requests, both filled, with both confirmed inside 38 hours.
  • Operational analysis and delivery management, which is the work of describing a business precisely enough for software to be built against it.
  • Brought into a company with no technology function, for a defined piece of work rather than into permanent roles.
  • The engagement of 2 months identifying and defining operational and digitisable processes.
Well-constructed questions helped us to understand our own needs much better, and many of the details suggested by the engineers ensured their high level of qualification.
Jenna Lysenko
Jenna Lysenko
Co-Founder, Sanitary Standard

A Strategic, Multi-Phase Hiring Approach

Phase: Request

Two requests opened together, neither for an engineer: a Business Analyst on process mapping, requirements traceability and backlog structure, and a Project Manager on Agile, Scrum and Kanban delivery, running a short fixed engagement to a defined end.

Phase: Matching

Candidates were judged on process work carried out inside operational businesses rather than software companies, and on the ability to get answers from people on site rather than from stakeholders in a meeting.

Phase: Interviews

Operations and technical support team as well as founding team met 6 candidates, and made decisions to hire 2, confirmed 38 hours after the request opened.

Phase: Engagement

Both engagements were sized to tasks, with monthly workload set beforehand, hour commitments in the daily trackers, and monthly hour reports.

Phase: Support

During two months of digitising operational processes changes to both workloads, and extra hours were requested and approved.